Initial Project Cost Accessment and Fee Schedule Generator
     
Name   Mobile   Date 12/13/2024
Address   City   Distance Km (BHILWARA)
               
Project Type            
Length (Right) in Feet : Length (Left) in Feet : Breadth (Front) in Feet : Breadth (Back) in Feet :
Area in Sq. Feet: Floor (s): Open Area: Total Area in Sq. Feet:
             
Architecture (Y/N) Rs. Per Sq. Feet Discount on Fee Project Cost (INR)
Concept (0.5%) (Y/N) Design (1.0%) (Y/N) Inspection (2%) (Y/N) Turn Key (2.0%) (Y/N)
  Type Design Inspection Turn Key Amount(INR) Date Status
Advance              
Payment 2              
Payment 3              
Payment 4              
Payment 5              
Payment 6              
  Total Fee            
             
Interior Design (Y/N) Rs. Per Sq. Feet Discount on Fee Project Cost (INR)
Concept (1.0%) (Y/N) Design (3.0%) (Y/N) Inspection (2.5%) (Y/N) Turn Key (2.5%) (Y/N)
  Type Design Inspection Turn Key Amount(INR) Date Status
Advance              
Payment 2              
Payment 3              
Payment 4              
Payment 5              
Payment 6              
  Total Fee